BD7.5m Phase Complete
Ministry of Works completed the first phase of infrastructure works in Wadi Al Buhair at a cost of BD7.5 million, covering road levelling and rainwater drainage linked to Tubli Bay. Two more phases are in progress: the second is set to g

Editorial Team Legacy
The legacy import form the old website to the new!
Editorial Team Legacy.